Project PJM-AG1-462 — Project Summary

Queue ID
PJM-AG1-462
Capacity
255 MW
Technology
Solar
Status
active
Location
Whiteside, IL
Region
PJM
Developer
IA Status
Feasibility Study

PJM-AG1-462

PJM-AG1-462BetaActiveSolarPJMLBNL

255 MW generation in Whiteside, IL · In queue since October 2020 · Proposed COD October 2023

255 MW

Capacity

1

Components

Solar

5y 7m

In Queue

Feasibility Study

IA Status

COD target: 2023

Interconnection

Total Duration

3 years

Schedule

32 months past proposed COD

Feasibility Study13%
Queue EntryOct 1, 2020

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2023-10-01

About

PJM-AG1-462 is a proposed solar generation project with a total capacity of 255 MW, located in Whiteside County, Illinois. The project is in the PJM interconnection queue, having entered the queue on October 1, 2020, with a proposed commercial operation date of October 1, 2023. The interconnecting utility is ComEd, and the point of interconnection is Cordova 345 kV. The project's interconnection status is currently in the Feasibility Study phase.

The development project consists solely of solar generation, with the 255 MW capacity attributed to solar photovoltaic technology. The project is listed as active within the PJM queue.

Generated from interconnection queue and public data sources

Project Details

State

IL

County

Whiteside

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

ComEd

Entity

PJM

Service Type

Point of Interconnection

Cordova 345 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
N ILLINOIS HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.