Turkey Solar
14.04 MW generation in Louisa, VA · In queue since September 2020 · Proposed COD August 2027
14.04 MW
Capacity
1
Components
Solar
5y 8m
In Queue
System Impact Study
IA Status
COD target: 2027
Total Duration
6y 11m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-08-29
The Turkey Solar project is a proposed 14.04 MW solar generation project located in Louisa County, Virginia. The project is in the PJM interconnection queue as entry PJM-AG1-469, with a queue entry date of September 30, 2020. Dominion is the interconnecting utility.
The proposed commercial operation date for the Turkey Solar project is August 29, 2027. Its interconnection status is currently in the System Impact Study phase. The point of interconnection is the Gordonsville 34.5 kV substation.
Generated from interconnection queue and public data sources
State
VA
County
Louisa
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
—
Point of Interconnection
Gordonsville 34.5 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Turkey Solar