54 MW generation in KY · In queue since September 2020 · Proposed COD October 2023
54 MW
Capacity
1
Components
Solar
5y 8m
In Queue
System Impact Study
IA Status
COD target: 2023
Total Duration
3y 1m
Schedule
31 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-10-02
PJM-AG1-471 is a proposed solar generation project with a total capacity of 54 MW. The project is located in Kentucky and is being developed within the PJM Interconnection queue. The queue entry date is September 30, 2020, with a proposed commercial operation date of October 2, 2023. The project's interconnection status is currently in the System Impact Study phase. The designated point of interconnection is the Up Church-Wayne County 69 kV line.
The project is sponsored by EKPC and consists solely of solar photovoltaic generation, with the entire 54 MW capacity attributed to solar. The project is listed as active within the PJM queue.
Generated from interconnection queue and public data sources
State
KY
County
—
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
EKPC
Entity
PJM
Service Type
—
Point of Interconnection
Up Church-Wayne County 69 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG1-471