Wilmington Solar Energy Project
19.9 MW hybrid in Will, IL · In queue since September 2020 · Proposed COD December 2027
19.9 MW
Capacity
1
Components
Solar
5y 8m
In Queue
System Impact Study
IA Status
COD target: 2027
Total Duration
7y 3m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-12-31
The Wilmington Solar Energy Project is a proposed 19.9 MW hybrid solar and battery energy project located in Will County, Illinois. The project consists of 19.9 MW of solar generation. It is in the PJM interconnection queue as project PJM-AG1-478, with a queue entry date of September 30, 2020. The proposed commercial operation date is December 31, 2027.
The project's interconnection status is currently in the System Impact Study phase. The interconnecting utility is ComEd, and the point of interconnection is the Wilmington 34.5 kV substation. The project has appeared in recent news.
Generated from interconnection queue and public data sources
State
IL
County
Will
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ComEd
Entity
PJM
Service Type
—
Point of Interconnection
Wilmington 34.5 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.