Ridge Road Solar Farm
19.8 MW generation in Hunterdon, NJ · In queue since September 2020 · Proposed COD October 2028
19.8 MW
Capacity
1
Components
Solar
5y 8m
In Queue
IA Executed
IA Status
COD target: 2028
Total Duration
8y 1m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2028-10-01
The Ridge Road Solar Farm is a proposed 19.8 MW solar generation project located in Hunterdon County, New Jersey. The project is in the PJM interconnection queue as entry AG1-495, with a queue entry date of September 30, 2020, and a proposed commercial operation date of October 1, 2028. The Interconnection Agreement (IA) for the project has been executed.
The proposed project, which will interconnect to the Gilbert-Rocktown 34.5 kV point of interconnection, is being developed within the JCPL utility territory and is actively listed in the PJM queue.
Generated from interconnection queue and public data sources
State
NJ
County
Hunterdon
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
JCPL
Entity
PJM
Service Type
—
Point of Interconnection
Gilbert-Rocktown 34.5 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Ridge Road Solar Farm