West Lorain 138 kV Power Plant (PJM-AG1-501) — Project Summary

Queue ID
PJM-AG1-501
Capacity
11.3 MW
Technology
Gas
Status
active
Location
Lorain, OH
Region
PJM
Developer
IA Status
IA Executed

West Lorain 138 kV Power Plant

PJM-AG1-501BetaActiveGasPJMLBNL + Live

11.3 MW generation in Lorain, OH · In queue since September 2020 · Proposed COD December 2028

11.3 MW

Capacity

1

Components

Gas

5y 8m

In Queue

IA Executed

IA Status

COD target: 2028

Interconnection

Total Duration

8y 3m

Construction75%
Queue EntrySep 30, 2020

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 24–48 months

Commercial Operation

Proposed COD: 2028-12-31

About

The West Lorain 138 kV Power Plant is a proposed 11.3 MW gas-fired generation project located in Lorain County, Ohio. The project is being developed within the PJM Interconnection queue as project AG1-501. Its queue entry date is September 30, 2020, and it has a proposed commercial operation date of December 31, 2028.

The project has an Interconnection Agreement (IA) that has been executed. The proposed point of interconnection (POI) is the Beaver 138 kV substation. The transmission utility is ATSI, and the interconnecting entity is PJM.

Generated from interconnection queue and public data sources

Project Details

State

OH

County

Lorain

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

ATSI

Entity

PJM

Service Type

Point of Interconnection

Beaver 138 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
BEAV DUQ22 KV UNIT2
POI Substation
Beaver Valley Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about West Lorain 138 kV Power Plant