PJM-AG1-526
222 MW generation in Garrard, KY · In queue since September 2020 · Proposed COD June 2023
222 MW
Capacity
1
Components
Solar
5y 8m
In Queue
Feasibility Study
IA Status
COD target: 2023
Total Duration
2y 9m
Schedule
36 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-06-01
PJM-AG1-526 is a proposed solar generation project with a total capacity of 222 MW, located in Garrard County, Kentucky. The project is in the PJM interconnection queue, having entered on September 30, 2020. The proposed commercial operation date is June 1, 2023. The interconnecting utility is EKPC, and the point of interconnection is the West Garrard 345 kV substation. The project's interconnection status is currently in the Feasibility Study phase.
The development project consists of 222 MW of solar photovoltaic generation. It is currently listed as an active project within the PJM queue.
Generated from interconnection queue and public data sources
State
KY
County
Garrard
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
EKPC
Entity
PJM
Service Type
—
Point of Interconnection
West Garrard 345 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- POI Substation
- West Garrard Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG1-526