Fields 2
13.5 MW generation in Greensville, VA · In queue since September 2020 · Proposed COD January 2028
13.5 MW
Capacity
1
Components
Solar
5y 8m
In Queue
System Impact Study
IA Status
COD target: 2028
Total Duration
7y 4m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-01-31
The Fields 2 project is a proposed 13.5 MW solar generation project located in Greensville County, Virginia. The project is being developed within the Dominion service area and has entered the PJM interconnection queue as project AG1-532 on September 30, 2020.
The proposed commercial operation date for Fields 2 is January 31, 2028. As of the latest data, the project's interconnection status is in the System Impact Study phase. The point of interconnection is the Fields 34.5 kV grid location.
Generated from interconnection queue and public data sources
State
VA
County
Greensville
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
—
Point of Interconnection
Fields 34.5 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.