PJM-AG1-551
19.99 MW generation in Martin, NC · In queue since September 2020 · Proposed COD October 2023
19.99 MW
Capacity
1
Components
Solar
5y 8m
In Queue
System Impact Study
IA Status
COD target: 2023
Total Duration
3y 1m
Schedule
31 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-10-15
PJM-AG1-551 is a proposed solar generation project with a total capacity of 19.99 MW. The project is located in Martin County, North Carolina, within the Dominion service area. It entered the PJM interconnection queue on September 30, 2020, with a proposed commercial operation date of October 15, 2023. As of the latest data, the project's interconnection status is in the System Impact Study phase.
The proposed project consists solely of solar generation, with the entire 19.99 MW capacity attributed to solar photovoltaic technology. The point of interconnection (POI) is at the Parmele 12.5 kV substation.
Generated from interconnection queue and public data sources
State
NC
County
Martin
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
—
Point of Interconnection
Parmele 12.5 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.