Project PJM-AG1-552 — Project Summary

Queue ID
PJM-AG1-552
Capacity
18 MW
Technology
Solar
Status
active
Location
Northampton, NC
Region
PJM
Developer
IA Status
Feasibility Study

PJM-AG1-552

PJM-AG1-552BetaActiveSolarPJMLBNL

18 MW generation in Northampton, NC · In queue since September 2020 · Proposed COD October 2023

18 MW

Capacity

1

Components

Solar

5y 8m

In Queue

Feasibility Study

IA Status

COD target: 2023

Interconnection

Total Duration

3y 1m

Schedule

31 months past proposed COD

Feasibility Study13%
Queue EntrySep 30, 2020

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2023-10-15

About

The proposed project PJM-AG1-552 is an 18 MW solar generation project located in Northampton County, North Carolina. The project is in the PJM interconnection queue, with an entry date of September 30, 2020, and a proposed commercial operation date of October 15, 2023. The interconnecting utility is Dominion. Its interconnection status is currently in the Feasibility Study phase.

The project consists of 18 MW of solar photovoltaic generation. It is located within the Dominion service area and will interconnect at the Carolina 13.2 kV point of interconnection. The project is listed as active within the PJM queue.

Generated from interconnection queue and public data sources

Project Details

State

NC

County

Northampton

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

Dominion

Entity

PJM

Service Type

Point of Interconnection

Carolina 13.2 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project PJM-AG1-552