PJM-AG1-553
284 MW generation in Rock Island, IL · In queue since September 2020 · Proposed COD December 2023
284 MW
Capacity
1
Components
Solar
5y 8m
In Queue
Feasibility Study
IA Status
COD target: 2023
Total Duration
3y 3m
Schedule
29 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-12-29
PJM-AG1-553 is a proposed solar generation project with a total capacity of 284 MW, located in Rock Island County, Illinois. The project is in the PJM interconnection queue, having entered the queue on September 30, 2020, with a proposed commercial operation date of December 29, 2023. The interconnection status is currently in the Feasibility Study phase, and the point of interconnection is the Cordova 345 kV substation.
The project is being developed within the ComEd utility territory. It consists of 284 MW of solar photovoltaic generation. The project is listed as active within the PJM queue.
Generated from interconnection queue and public data sources
State
IL
County
Rock Island
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ComEd
Entity
PJM
Service Type
—
Point of Interconnection
Cordova 345 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.