Scioty Solar
49.99 MW generation in Hardin, OH · In queue since September 2020 · Proposed COD October 2027
49.99 MW
Capacity
1
Components
Solar
5y 8m
In Queue
IA Executed
IA Status
COD target: 2027
Total Duration
7y 1m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2027-10-01
The Scioty Solar project is a proposed solar generation facility with a total capacity of 49.99 MW, located in Hardin County, Ohio. The project is being developed within the PJM Interconnection region and is interconnected with AEP at the South Kenton 138 kV point of interconnection.
The project, identified as PJM-AG1-554 in the PJM queue, entered the queue on September 30, 2020, and has a proposed commercial operation date of October 1, 2027. The interconnection agreement for the project has been executed.
Generated from interconnection queue and public data sources
State
OH
County
Hardin
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
South Kenton 138 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- MYSVL_EK138 KV LD_154
- POI Substation
- Kenton
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.