Rainbow Trout
120 MW hybrid in Tippecanoe, IN · In queue since September 2020 · Proposed COD January 2029
120 MW
Capacity
1
Components
Solar
5y 8m
In Queue
IA Executed
IA Status
COD target: 2029
Total Duration
8y 4m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 18–30 months
Proposed COD: 2029-01-31
The Rainbow Trout project is a proposed 120 MW solar and battery hybrid development in Tippecanoe County, Indiana. The project is interconnected to the PJM grid at the Dequine 345 kV point of interconnection. It entered the PJM interconnection queue as project AG1-555 on September 30, 2020, with a proposed commercial operation date of January 31, 2029. The interconnection agreement has been executed.
The project consists of 120 MW of solar generation capacity. The Rainbow Trout project has been the subject of recent news coverage, with eight articles published about it.
Generated from interconnection queue and public data sources
State
IN
County
Tippecanoe
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Dequine 345 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- POI Substation
- Dequine Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-14