Powerton-Nevada 345 kV
200 MW storage in Lasalle, IL · In queue since March 2025
200 MW
Capacity
0
Components
1y 2m
In Queue
—
IA Status
Total Duration
1y 2m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
The proposed Powerton-Nevada 345 kV project is a 200 MW battery storage development in Lasalle County, Illinois. It is located within the ComEd service area of the PJM Interconnection region. The project entered the PJM queue as AG2-061 on March 14, 2025, and was subsequently moved to queue TC2.
The project is currently listed as active in the interconnection queue. It is designated as a generation interconnection project.
Generated from interconnection queue and public data sources
State
IL
County
Lasalle
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ComEd
Entity
PJM
Service Type
Generation Interconnection
Data Source
Live · PJM
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Powerton-Nevada 345 kV