PJM-AG2-062
147 MW generation in Grant, WV · In queue since December 2020 · Proposed COD August 2022
147 MW
Capacity
1
Components
Wind
5y 5m
In Queue
In Progress (unknown study)
IA Status
COD target: 2022
Total Duration
1y 8m
Schedule
46 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2022-08-01
PJM-AG2-062 is a proposed wind generation project with a total capacity of 147 MW. The project is located in Grant County, West Virginia, and is interconnected within the PJM Interconnection queue. The queue entry date is December 15, 2020, with a proposed commercial operation date of August 1, 2022.
The interconnection agreement (IA) status for PJM-AG2-062 is listed as "In Progress (unknown study)". The designated point of interconnection (POI) is the Williams 138 kV substation. The project's listed utility is APS.
Generated from interconnection queue and public data sources
State
WV
County
Grant
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
APS
Entity
PJM
Service Type
—
Point of Interconnection
Williams 138 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- POI Substation
- Williams Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.