PJM-AG2-068
100 MW generation in Brunswick, VA · In queue since December 2020 · Proposed COD December 2025
100 MW
Capacity
1
Components
Solar
5y 5m
In Queue
In Progress (unknown study)
IA Status
COD target: 2025
Total Duration
5 years
Schedule
5 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-12-01
PJM-AG2-068 is a proposed solar generation project with a total capacity of 100 MW. The project is located in Brunswick County, Virginia, within the Dominion service area. It is an active project in the PJM interconnection queue, with an entry date of December 30, 2020, and a proposed commercial operation date of December 1, 2025. The interconnection agreement status is listed as "In Progress (unknown study)".
The proposed project consists of 100 MW of solar photovoltaic generation. Its point of interconnection (POI) is the Heritage-Wake 500 kV substation.
Generated from interconnection queue and public data sources
State
VA
County
Brunswick
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
—
Point of Interconnection
Heritage-Wake 500 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG2-068