PJM-AG2-072
700 MW generation in Spencer, IN · In queue since January 2021 · Proposed COD May 2026
700 MW
Capacity
1
Components
Gas
5y 4m
In Queue
In Progress (unknown study)
IA Status
COD target: 2026
Total Duration
5y 4m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-05-31
PJM-AG2-072 is a proposed 700 MW natural gas generation project located in Spencer County, Indiana. The project, which consists of 700 MW of gas-fired generation, is in the PJM interconnection queue as of January 6, 2021. The proposed commercial operation date is May 31, 2026. The interconnection agreement status is listed as "In Progress (unknown study)". The interconnecting utility is AEP, and the point of interconnection is Rockport 765 kV.
Generated from interconnection queue and public data sources
State
IN
County
Spencer
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Rockport 765 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- ROCKPOR226 KV MISOM2M7
- POI Substation
- Rockport Station
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.