PJM-AG2-073
100 MW generation in Madison, KY · In queue since January 2021 · Proposed COD May 2024
100 MW
Capacity
1
Components
Solar
5y 4m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
3y 4m
Schedule
24 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-05-01
PJM-AG2-073 is a proposed solar generation project with a total capacity of 100 MW, located in Madison County, Kentucky. The project is being developed within the PJM Interconnection queue, with an entry date of January 11, 2021, and a proposed commercial operation date of May 1, 2024. The interconnecting utility is EKPC.
The project's interconnection status is listed as "In Progress (unknown study)". The point of interconnection (POI) is the Crooksville 69 kV substation.
Generated from interconnection queue and public data sources
State
KY
County
Madison
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
EKPC
Entity
PJM
Service Type
—
Point of Interconnection
Crooksville 69 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- CROOKSVI138 KV SUBURBLF
- POI Substation
- Crooksville Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG2-073