PJM-AG2-080
100 MW storage in Rockbridge, VA · In queue since January 2021 · Proposed COD June 2024
100 MW
Capacity
1
Components
Battery
5y 4m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
3y 5m
Schedule
23 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-06-01
PJM-AG2-080 is a proposed 100 MW battery storage project located in Rockbridge County, Virginia. The project is interconnected within the PJM Interconnection queue, having entered the queue on January 21, 2021. Dominion is the utility associated with the project.
The proposed commercial operation date for PJM-AG2-080 is June 1, 2024. The interconnection agreement status is currently listed as "In Progress (unknown study)". The point of interconnection is the Lexington 115 kV substation.
Generated from interconnection queue and public data sources
State
VA
County
Rockbridge
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
—
Point of Interconnection
Lexington 115 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- LEXINGTON
- POI Substation
- Lexington 500kV Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.