100 MW storage in Howard, IN · In queue since January 2021 · Proposed COD December 2023
100 MW
Capacity
1
Components
Battery
5y 4m
In Queue
In Progress (unknown study)
IA Status
COD target: 2023
Total Duration
2y 11m
Schedule
28 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-12-31
PJM-AG2-084 is a proposed 100 MW battery storage project located in Howard County, Indiana. The project is in the PJM interconnection queue, having entered on January 22, 2021, with a proposed commercial operation date of December 31, 2023. The interconnection agreement status is listed as "In Progress (unknown study)".
The project, which is being developed within the AEP utility territory, consists entirely of battery storage. The point of interconnection is the Greentown 138 kV substation.
Generated from interconnection queue and public data sources
State
IN
County
Howard
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Greentown 138 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- POI Substation
- Greentown Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.