PJM-AG2-088
150 MW storage in Chesterfield, VA · In queue since January 2021 · Proposed COD April 2022
150 MW
Capacity
1
Components
Battery
5y 4m
In Queue
In Progress (unknown study)
IA Status
COD target: 2022
Total Duration
1y 3m
Schedule
49 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2022-04-15
PJM-AG2-088 is a proposed 150 MW battery storage project located in Chesterfield County, Virginia. The project, which is in the PJM interconnection queue, entered the queue on January 26, 2021, and has a proposed commercial operation date of April 15, 2022. Dominion is the utility associated with the project.
The interconnection agreement status is listed as "In Progress (unknown study)". The point of interconnection is the Midlothian 230 kV substation.
Generated from interconnection queue and public data sources
State
VA
County
Chesterfield
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
—
Point of Interconnection
Midlothian 230 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- MIDLOTH 35 KV DRYBRIBS
- POI Substation
- Midlothian Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG2-088