PJM-AG2-095
18 MW generation in Prince George, VA · In queue since January 2021 · Proposed COD December 2023
18 MW
Capacity
1
Components
Solar
5y 4m
In Queue
In Progress (unknown study)
IA Status
COD target: 2023
Total Duration
2y 11m
Schedule
29 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-12-08
PJM-AG2-095 is a proposed solar generation project located in Prince George County, Virginia. The project, with a total capacity of 18 MW, is being developed within the Dominion service area. It entered the PJM interconnection queue on January 28, 2021, with a proposed commercial operation date of December 8, 2023.
The project's interconnection agreement status is listed as "In Progress (unknown study)". The point of interconnection is the Hopewell 34.5 kV substation (Circuit 313).
Generated from interconnection queue and public data sources
State
VA
County
Prince George
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
—
Point of Interconnection
Hopewell 34.5 kV (Circuit 313)
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG2-095