PJM-AG2-111
14.8 MW generation in Campbell, VA · In queue since January 2021 · Proposed COD February 2023
14.8 MW
Capacity
1
Components
Solar
5y 4m
In Queue
In Progress (unknown study)
IA Status
COD target: 2023
Total Duration
2y 1m
Schedule
39 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-02-06
PJM-AG2-111 is a proposed solar generation project with a total capacity of 14.8 MW, located in Campbell County, Virginia. The project is in the PJM interconnection queue as of January 29, 2021, with a proposed commercial operation date of February 6, 2023. Dominion is the interconnecting utility.
The interconnection agreement for PJM-AG2-111 is currently listed as "In Progress (unknown study)". The point of interconnection is the Perth 34.5 kV Substation (Circuit 408).
Generated from interconnection queue and public data sources
State
VA
County
Campbell
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
—
Point of Interconnection
Perth 34.5 kV Substation (Circuit 408)
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- HIGH
- POI Substation
- Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.