Project PJM-AG2-114 — Project Summary

Queue ID
PJM-AG2-114
Capacity
100 MW
Technology
Solar
Status
active
Location
Livingston, IL
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AG2-114

PJM-AG2-114BetaActiveSolarPJMLBNL

100 MW generation in Livingston, IL · In queue since January 2021 · Proposed COD March 2024

100 MW

Capacity

1

Components

Solar

5y 4m

In Queue

In Progress (unknown study)

IA Status

COD target: 2024

Interconnection

Total Duration

3y 2m

Schedule

26 months past proposed COD

In Study38%
Queue EntryJan 29, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-03-01

About

PJM-AG2-114 is a proposed solar generation project with a total capacity of 100 MW, located in Livingston County, Illinois. The project is in the PJM interconnection queue, having entered on January 29, 2021, with a proposed commercial operation date of March 1, 2024. The interconnecting utility is ComEd, and the point of interconnection is the Dresden-Pontiac Midpoint 345 kV line. The interconnection agreement status is listed as "In Progress (unknown study)".

The development project consists of 100 MW of solar photovoltaic generation. It is currently listed as an active project within the PJM queue. The developer is not specified in the queue data.

Generated from interconnection queue and public data sources

Project Details

State

IL

County

Livingston

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

ComEd

Entity

PJM

Service Type

Point of Interconnection

Dresden-Pontiac Midpoint 345 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
N ILLINOIS HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.