Project PJM-AG2-119 — Project Summary

Queue ID
PJM-AG2-119
Capacity
80 MW
Technology
Solar
Status
active
Location
Marion, OH
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AG2-119

PJM-AG2-119BetaActiveSolarPJMLBNL

80 MW generation in Marion, OH · In queue since January 2021 · Proposed COD September 2024

80 MW

Capacity

1

Components

Solar

5y 4m

In Queue

In Progress (unknown study)

IA Status

COD target: 2024

Interconnection

Total Duration

3y 8m

Schedule

20 months past proposed COD

In Study38%
Queue EntryJan 29, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-09-01

About

PJM-AG2-119 is a proposed solar generation project located in Marion County, Ohio, with a total capacity of 80 MW. The project consists of 80 MW of solar photovoltaic generation. It is listed in the PJM interconnection queue as of January 29, 2021, with a proposed commercial operation date of September 1, 2024. The interconnection agreement status is listed as "In Progress (unknown study)".

The project is being developed within the ATSI utility territory and is interconnected to the Galion-Roberts South 138 kV II point of interconnection. The project is currently listed as active in the PJM interconnection queue. The developer is not specified in the queue data.

Generated from interconnection queue and public data sources

Project Details

State

OH

County

Marion

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

ATSI

Entity

PJM

Service Type

Point of Interconnection

Galion-Roberts South 138 kV II

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
SOUTH

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.