Project PJM-AG2-149 — Project Summary

Queue ID
PJM-AG2-149
Capacity
400 MW
Technology
Solar
Status
active
Location
Crawford, OH
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AG2-149

PJM-AG2-149BetaActiveSolarPJMLBNL

400 MW generation in Crawford, OH · In queue since February 2021 · Proposed COD December 2024

400 MW

Capacity

1

Components

Solar

5y 3m

In Queue

In Progress (unknown study)

IA Status

COD target: 2024

Interconnection

Total Duration

3y 10m

Schedule

17 months past proposed COD

In Study38%
Queue EntryFeb 22, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-12-02

About

PJM-AG2-149 is a proposed solar generation project with a total capacity of 400 MW, located in Crawford County, Ohio. The project is in the PJM interconnection queue as of February 22, 2021, with a proposed commercial operation date of December 2, 2024. The interconnection agreement status is listed as "In Progress (unknown study)". The interconnecting utility is AEP, and the point of interconnection is the Galion-South Berwick 345 kV line.

The development project consists solely of solar photovoltaic generation, with the single solar component accounting for the entire 400 MW capacity. The project is currently listed as "active" within the PJM queue.

Generated from interconnection queue and public data sources

Project Details

State

OH

County

Crawford

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

AEP

Entity

PJM

Service Type

Point of Interconnection

Galion-South Berwick 345 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.