PJM-AG2-150
5.25 MW generation in Allegheny, PA · In queue since February 2021 · Proposed COD December 2022
5.25 MW
Capacity
1
Components
Hydro
5y 3m
In Queue
In Progress (unknown study)
IA Status
COD target: 2022
Total Duration
1y 10m
Schedule
41 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2022-12-31
PJM-AG2-150 is a proposed hydroelectric generation project located in Allegheny County, Pennsylvania, within the PJM Interconnection region. The project, with a total capacity of 5.25 MW, entered the PJM queue on February 23, 2021, with a proposed commercial operation date of December 31, 2022. The point of interconnection is River Dock 23 kV.
The project's interconnection agreement status is listed as "In Progress (unknown study)". The designated utility is DL, and the entity is PJM.
Generated from interconnection queue and public data sources
State
PA
County
Allegheny
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
DL
Entity
PJM
Service Type
—
Point of Interconnection
River Dock 23 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- 955 RIVE16 KV RV-2
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG2-150