Project PJM-AG2-182 — Project Summary

Queue ID
PJM-AG2-182
Capacity
200 MW
Technology
Solar+Battery
Status
active
Location
Frederick, VA
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AG2-182

PJM-AG2-182BetaActiveSolarBatteryPJMLBNL

200 MW hybrid in Frederick, VA · In queue since February 2021 · Proposed COD December 2022

200 MW

Capacity

1

Components

Solar

5y 3m

In Queue

In Progress (unknown study)

IA Status

COD target: 2022

Interconnection

Total Duration

1y 10m

Schedule

41 months past proposed COD

In Study38%
Queue EntryFeb 26, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2022-12-31

About

The proposed project PJM-AG2-182 is a 200 MW hybrid solar and battery energy storage development in Frederick County, Virginia. Interconnecting within the PJM Interconnection queue under utility Dominion, the project entered the queue on February 26, 2021, with a proposed commercial operation date of December 31, 2022. The interconnection agreement status is currently listed as "In Progress (unknown study)".

The project consists of 200 MW of solar generation capacity, coupled with battery energy storage. The point of interconnection is the Doubs-Bismark 500 kV line. The project is currently listed as active in the interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

VA

County

Frederick

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

Dominion

Entity

PJM

Service Type

Point of Interconnection

Doubs-Bismark 500 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project PJM-AG2-182