PJM-AG2-188
140 MW generation in Cumberland, VA · In queue since February 2021 · Proposed COD March 2024
140 MW
Capacity
1
Components
Solar
5y 3m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
3y 1m
Schedule
26 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-03-01
PJM-AG2-188 is a proposed solar generation project with a total capacity of 140 MW. The project is located in Cumberland County, Virginia, within the PJM Interconnection region. Dominion is the interconnecting utility. The project entered the PJM queue on February 27, 2021, with a proposed commercial operation date of March 1, 2024.
The interconnection agreement for PJM-AG2-188 is currently listed as "In Progress (unknown study)". The point of interconnection is the Farmville-Bucking 230 kV line.
Generated from interconnection queue and public data sources
State
VA
County
Cumberland
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
—
Point of Interconnection
Farmville-Bucking 230 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG2-188