PJM-AG2-192
20 MW hybrid in Grant, IN · In queue since February 2021 · Proposed COD December 2023
20 MW
Capacity
1
Components
Solar
5y 3m
In Queue
In Progress (unknown study)
IA Status
COD target: 2023
Total Duration
2y 10m
Schedule
29 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-12-15
PJM-AG2-192 is a proposed 20 MW hybrid solar and battery project located in Grant County, Indiana. The project, which consists of 20 MW of solar capacity, is in the PJM interconnection queue as of February 27, 2021, with a proposed commercial operation date of December 15, 2023. The interconnecting utility is AEP, and the point of interconnection is the Mississinewa 138 kV substation.
The project's interconnection status is listed as "In Progress (unknown study)".
Generated from interconnection queue and public data sources
State
IN
County
Grant
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Mississinewa 138 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG2-192