Project PJM-AG2-202 — Project Summary

Queue ID
PJM-AG2-202
Capacity
20 MW
Technology
Battery
Status
active
Location
City Of Lynchburg, VA
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AG2-202

PJM-AG2-202BetaActiveBatteryPJMLBNL

20 MW storage in City Of Lynchburg, VA · In queue since March 2021 · Proposed COD October 2022

20 MW

Capacity

1

Components

Battery

5y 2m

In Queue

In Progress (unknown study)

IA Status

COD target: 2022

Interconnection

Total Duration

1y 7m

Schedule

43 months past proposed COD

In Study38%
Queue EntryMar 4, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2022-10-31

About

The proposed project PJM-AG2-202 is a 20 MW battery storage development located in the City of Lynchburg, Virginia. Interconnecting within the PJM Interconnection queue under American Electric Power (AEP), the project entered the queue on March 4, 2021, with a proposed commercial operation date of October 31, 2022.

The interconnection agreement (IA) status is currently listed as "In Progress (unknown study)". The point of interconnection (POI) is the Reusens 12.47 kV substation.

Generated from interconnection queue and public data sources

Project Details

State

VA

County

City Of Lynchburg

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

AEP

Entity

PJM

Service Type

Point of Interconnection

Reusens 12.47 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
REUSENS 4 KV RE1
POI Substation
Reusens Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.