Project PJM-AG2-220 — Project Summary

Queue ID
PJM-AG2-220
Capacity
31 MW
Technology
Solar
Status
active
Location
Bradford, PA
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AG2-220

PJM-AG2-220BetaActiveSolarPJMLBNL

31 MW generation in Bradford, PA · In queue since March 2021 · Proposed COD September 2025

31 MW

Capacity

1

Components

Solar

5y 2m

In Queue

In Progress (unknown study)

IA Status

COD target: 2025

Interconnection

Total Duration

4y 6m

Schedule

7 months past proposed COD

In Study38%
Queue EntryMar 10, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-09-30

About

PJM-AG2-220 is a proposed solar generation project located in Bradford County, Pennsylvania, with a total capacity of 31 MW. The project consists of 31 MW of solar photovoltaic generation. It is listed in the PJM interconnection queue as of March 10, 2021, with a proposed commercial operation date of September 30, 2025. The interconnection agreement status is listed as "In Progress (unknown study)".

The proposed project is interconnected to the PENELEC utility grid at the East Towanda-South Troy 115 kV point of interconnection. The project is currently listed as active within the PJM queue.

Generated from interconnection queue and public data sources

Project Details

State

PA

County

Bradford

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

PENELEC

Entity

PJM

Service Type

Point of Interconnection

East Towanda-South Troy 115 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
WESTERN HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project PJM-AG2-220