PJM-AG2-220
31 MW generation in Bradford, PA · In queue since March 2021 · Proposed COD September 2025
31 MW
Capacity
1
Components
Solar
5y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2025
Total Duration
4y 6m
Schedule
7 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-09-30
PJM-AG2-220 is a proposed solar generation project located in Bradford County, Pennsylvania, with a total capacity of 31 MW. The project consists of 31 MW of solar photovoltaic generation. It is listed in the PJM interconnection queue as of March 10, 2021, with a proposed commercial operation date of September 30, 2025. The interconnection agreement status is listed as "In Progress (unknown study)".
The proposed project is interconnected to the PENELEC utility grid at the East Towanda-South Troy 115 kV point of interconnection. The project is currently listed as active within the PJM queue.
Generated from interconnection queue and public data sources
State
PA
County
Bradford
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
PENELEC
Entity
PJM
Service Type
—
Point of Interconnection
East Towanda-South Troy 115 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG2-220