PJM-AG2-221
20 MW generation in Bradford, PA · In queue since March 2021 · Proposed COD September 2024
20 MW
Capacity
1
Components
Solar
5y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
3y 6m
Schedule
19 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-09-30
PJM-AG2-221 is a proposed 20 MW solar generation project located in Bradford County, Pennsylvania. The project is interconnected within the PJM Interconnection queue, with an entry date of March 10, 2021. The proposed commercial operation date is September 30, 2024.
The interconnection agreement (IA) status for PJM-AG2-221 is listed as "In Progress (unknown study)". The point of interconnection (POI) is the South Troy - North Towanda 34.5 kV line. The project is within the PENELEC utility territory.
Generated from interconnection queue and public data sources
State
PA
County
Bradford
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
PENELEC
Entity
PJM
Service Type
—
Point of Interconnection
South Troy - North Towanda 34.5 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- SOUTH
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG2-221