Project PJM-AG2-228 — Project Summary

Queue ID
PJM-AG2-228
Capacity
11.2 MW
Technology
Solar
Status
active
Location
Warren, NJ
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AG2-228

PJM-AG2-228BetaActiveSolarPJMLBNL

11.2 MW generation in Warren, NJ · In queue since March 2021 · Proposed COD March 2022

11.2 MW

Capacity

1

Components

Solar

5y 2m

In Queue

In Progress (unknown study)

IA Status

COD target: 2022

Interconnection

Total Duration

1 year

Schedule

50 months past proposed COD

In Study38%
Queue EntryMar 12, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2022-03-31

About

PJM-AG2-228 is a proposed solar generation project located in Warren County, New Jersey, with a total capacity of 11.2 MW. The project, which interconnects to the JCPL utility via the Pequest River-Washington 34.5 kV point of interconnection, entered the PJM interconnection queue on March 12, 2021. Its proposed commercial operation date is March 31, 2022, and the interconnection agreement status is currently listed as "In Progress (unknown study)".

The development project consists solely of solar photovoltaic generation. It is currently listed as "active" within the PJM queue.

Generated from interconnection queue and public data sources

Project Details

State

NJ

County

Warren

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

JCPL

Entity

PJM

Service Type

Point of Interconnection

Pequest River-Washington 34.5 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
WESTERN HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.