150 MW generation in St. Joseph, IN · In queue since March 2021 · Proposed COD December 2024
150 MW
Capacity
1
Components
Solar
5y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
3y 9m
Schedule
16 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-12-31
The proposed solar project PJM-AG2-230, with a total capacity of 150 MW, is located in St. Joseph County, Indiana. Interconnecting to the PJM Interconnection queue on March 12, 2021, the project's proposed commercial operation date is December 31, 2024. The interconnection agreement status is currently listed as "In Progress (unknown study)".
The project, which is being developed within the AEP utility territory, consists of 150 MW of solar generation. Its point of interconnection is the Dumont 345 kV substation.
Generated from interconnection queue and public data sources
State
IN
County
St. Joseph
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Dumont 345 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- DUMONT
- POI Substation
- Indiana Michigan Power/AEP Dumont 345kV-765kV Substation