Project PJM-AG2-288 — Project Summary

Queue ID
PJM-AG2-288
Capacity
150 MW
Technology
Battery
Status
active
Location
Frederick, VA
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AG2-288

PJM-AG2-288BetaActiveBatteryPJMLBNL

150 MW storage in Frederick, VA · In queue since March 2021 · Proposed COD December 2023

150 MW

Capacity

1

Components

Battery

5y 2m

In Queue

In Progress (unknown study)

IA Status

COD target: 2023

Interconnection

Total Duration

2y 9m

Schedule

28 months past proposed COD

In Study38%
Queue EntryMar 22, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2023-12-31

About

PJM-AG2-288 is a proposed 150 MW battery storage project located in Frederick County, Virginia. The project is interconnected within the PJM Interconnection queue, having entered the queue on March 22, 2021. The proposed commercial operation date is December 31, 2023.

The interconnection agreement for the project with utility APS is currently in progress, with the specific study status unknown. The point of interconnection is at the Stonewall 138 kV substation. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

VA

County

Frederick

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

APS

Entity

PJM

Service Type

Point of Interconnection

Stonewall 138 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
STEPHENS138 KV T2
POI Substation
Stonewall Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project PJM-AG2-288