PJM-AG2-289
100 MW generation in Seneca, OH · In queue since March 2021 · Proposed COD December 2024
100 MW
Capacity
1
Components
Solar
5y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
3y 9m
Schedule
17 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-12-02
PJM-AG2-289 is a proposed solar generation project located in Seneca County, Ohio, within the PJM Interconnection region. The project, with a total capacity of 100 MW, consists entirely of solar photovoltaic technology. The interconnecting utility is AEP.
The project entered the PJM interconnection queue on March 23, 2021, with a proposed commercial operation date of December 2, 2024. Its interconnection agreement status is currently listed as "In Progress (unknown study)". The point of interconnection is the Amsden _x0013_ Fremont Center 69 kV line.
Generated from interconnection queue and public data sources
State
OH
County
Seneca
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Amsden _x0013_ Fremont Center 69 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG2-289