Project PJM-AG2-297 — Project Summary

Queue ID
PJM-AG2-297
Capacity
19 MW
Technology
Solar
Status
active
Location
Cumberland, NJ
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AG2-297

PJM-AG2-297BetaActiveSolarPJMLBNL

19 MW generation in Cumberland, NJ · In queue since March 2021 · Proposed COD June 2023

19 MW

Capacity

1

Components

Solar

5y 2m

In Queue

In Progress (unknown study)

IA Status

COD target: 2023

Interconnection

Total Duration

2y 3m

Schedule

36 months past proposed COD

In Study38%
Queue EntryMar 23, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2023-06-01

About

PJM-AG2-297 is a proposed solar generation project located in Cumberland County, New Jersey, within the PJM Interconnection region. The development project, with a total capacity of 19 MW, consists entirely of solar photovoltaic generation. The project was entered into the PJM interconnection queue on March 23, 2021, with a proposed commercial operation date of June 1, 2023. Its interconnection agreement status is currently listed as "In Progress (unknown study)".

The proposed project is being developed within the Atlantic Electric Company (AEC) service area and connects to the Cumberland 230 kV point of interconnection. The project is currently listed as active within the PJM queue.

Generated from interconnection queue and public data sources

Project Details

State

NJ

County

Cumberland

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

AEC

Entity

PJM

Service Type

Point of Interconnection

Cumberland 230 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
WESTERN HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
CUMB APS138 KV T9
POI Substation
Cumberland Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project PJM-AG2-297