PJM-AG2-298
60 MW generation in Marion, KY · In queue since March 2021 · Proposed COD September 2024
60 MW
Capacity
1
Components
Solar
5y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
3y 6m
Schedule
20 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-09-01
PJM-AG2-298 is a proposed 60 MW solar generation project located in Marion County, Kentucky. The project is in the PJM interconnection queue as of March 23, 2021, with a proposed commercial operation date of September 1, 2024. The interconnection agreement status is listed as "In Progress (unknown study)".
The project, which is being developed by EKPC, consists of 60 MW of solar photovoltaic generation. It is interconnecting to the grid at the Loretto 69 kV point of interconnection. The project is currently listed as active in the PJM queue.
Generated from interconnection queue and public data sources
State
KY
County
Marion
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
EKPC
Entity
PJM
Service Type
—
Point of Interconnection
Loretto 69 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- LORETTO 69 KV PRNCSS
- POI Substation
- Loretto Substation