Project PJM-AG2-310 — Project Summary

Queue ID
PJM-AG2-310
Capacity
100 MW
Technology
Battery
Status
active
Location
Roanoke, VA
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AG2-310

PJM-AG2-310BetaActiveBatteryPJMLBNL

100 MW storage in Roanoke, VA · In queue since March 2021 · Proposed COD December 2023

100 MW

Capacity

1

Components

Battery

5y 2m

In Queue

In Progress (unknown study)

IA Status

COD target: 2023

Interconnection

Total Duration

2y 9m

Schedule

28 months past proposed COD

In Study38%
Queue EntryMar 23, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2023-12-31

About

PJM-AG2-310 is a proposed 100 MW battery storage project located in Roanoke County, Virginia. The project is interconnected within the PJM Interconnection queue, with an entry date of March 23, 2021. The proposed commercial operation date is December 31, 2023. The interconnection agreement status is listed as "In Progress (unknown study)".

The project, which is being developed within the AEP utility territory, consists of a single 100 MW battery component. The point of interconnection is the Matt Funk 138 kV substation. The project is currently listed as active within the PJM queue.

Generated from interconnection queue and public data sources

Project Details

State

VA

County

Roanoke

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

AEP

Entity

PJM

Service Type

Point of Interconnection

Matt Funk 138 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
KUMIS 138 KV T1
POI Substation
Matt Funk 138KV Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.