PJM-AG2-311
75 MW storage in Bedford, VA · In queue since March 2021 · Proposed COD December 2023
75 MW
Capacity
1
Components
Battery
5y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2023
Total Duration
2y 9m
Schedule
28 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-12-31
PJM-AG2-311 is a proposed 75 MW battery storage project located in Bedford County, Virginia. The project is interconnected within the PJM Interconnection queue, having entered the queue on March 23, 2021. The proposed commercial operation date is December 31, 2023.
The interconnection agreement for the project is currently listed as "In Progress (unknown study)". The designated point of interconnection (POI) is the Smith Mountain 138 kV substation. The interconnecting utility is AEP.
Generated from interconnection queue and public data sources
State
VA
County
Bedford
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Smith Mountain 138 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- SMITHMOU13.8 KV SM1
- POI Substation
- Smith Mountain Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG2-311