PJM-AG2-320
150 MW storage in Caroline, VA · In queue since March 2021 · Proposed COD December 2023
150 MW
Capacity
1
Components
Battery
5y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2023
Total Duration
2y 9m
Schedule
28 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-12-31
PJM-AG2-320 is a proposed 150 MW battery storage project located in Caroline County, Virginia. The project is interconnected within the PJM Interconnection queue, having entered the queue on March 24, 2021. Dominion is the listed utility. The proposed commercial operation date is December 31, 2023, and the interconnection agreement is currently listed as "In Progress (unknown study)".
The development project consists solely of battery storage, with a total capacity of 150 MW. The point of interconnection is at the Ladysmith 230 kV substation.
Generated from interconnection queue and public data sources
State
VA
County
Caroline
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
—
Point of Interconnection
Ladysmith 230 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- LADYSMCT14 KV GT1
- POI Substation
- Ladysmith Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG2-320