PJM-AG2-329
200 MW storage in Wyandot, OH · In queue since March 2021 · Proposed COD December 2024
200 MW
Capacity
1
Components
Battery
5y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
3y 9m
Schedule
17 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-12-02
PJM-AG2-329 is a proposed 200 MW battery storage project located in Wyandot County, Ohio. The project, which interconnects to the PJM Interconnection queue, entered the queue on March 25, 2021, with a proposed commercial operation date of December 2, 2024. The interconnection agreement status is currently listed as "In Progress (unknown study)".
The project is being developed within the American Electric Power (AEP) service territory. The point of interconnection is the S Berwick - Galion 345 kV line. The project has appeared in recent news coverage regarding energy storage development in the PJM region.
Generated from interconnection queue and public data sources
State
OH
County
Wyandot
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
S Berwick - Galion 345 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG2-329