PJM-AG2-336
80 MW generation in Henry, OH · In queue since March 2021 · Proposed COD November 2023
80 MW
Capacity
1
Components
Solar
5y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2023
Total Duration
2y 8m
Schedule
30 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-11-30
PJM-AG2-336 is a proposed 80 MW solar generation project located in Henry County, Ohio. The project is interconnected within the PJM Interconnection queue as of March 25, 2021, with a proposed commercial operation date of November 30, 2023. The interconnecting utility is ATSI.
The project's interconnection agreement status is listed as "In Progress (unknown study)". Recent news coverage of the project is available.
Generated from interconnection queue and public data sources
State
OH
County
Henry
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ATSI
Entity
PJM
Service Type
—
Point of Interconnection
Midway 138 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- LBRTYCEC69 KV T1
- POI Substation
- Midway Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.