PJM-AG2-337
20 MW generation in Henry, OH · In queue since March 2021 · Proposed COD November 2023
20 MW
Capacity
1
Components
Solar
5y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2023
Total Duration
2y 8m
Schedule
30 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-11-30
PJM-AG2-337 is a proposed solar generation project located in Henry County, Ohio, with a total capacity of 20 MW. The project is interconnected within the PJM Interconnection queue, having entered the queue on March 25, 2021. The proposed commercial operation date is November 30, 2023. The project's interconnection agreement status is currently "In Progress (unknown study)".
The proposed project is located within the service territory of ATSI. It consists of 20 MW of solar photovoltaic generation. The point of interconnection is the Midway 138 kV II substation.
Generated from interconnection queue and public data sources
State
OH
County
Henry
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ATSI
Entity
PJM
Service Type
—
Point of Interconnection
Midway 138 kV II
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- POI Substation
- Midway
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.