PJM-AG2-341
50 MW storage in Mecklenburg, VA · In queue since March 2021 · Proposed COD December 2024
50 MW
Capacity
1
Components
Battery
5y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
3y 9m
Schedule
17 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-12-01
PJM-AG2-341 is a proposed 50 MW battery storage project located in Mecklenburg County, Virginia. The project is in the PJM interconnection queue, having entered on March 25, 2021, with a proposed commercial operation date of December 1, 2024. Dominion is the interconnecting utility.
The interconnection agreement for PJM-AG2-341 is currently listed as "In Progress (unknown study)". The point of interconnection is the Ridge Road 115 kV substation.
Generated from interconnection queue and public data sources
State
VA
County
Mecklenburg
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
—
Point of Interconnection
Ridge Road 115 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- PRNCTNPS69 KV PUCGFCT
- POI Substation
- Ridge Road Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG2-341