Project PJM-AG2-344 — Project Summary

Queue ID
PJM-AG2-344
Capacity
100 MW
Technology
Battery
Status
active
Location
IN
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AG2-344

PJM-AG2-344BetaActiveBatteryPJMLBNL

100 MW storage in IN · In queue since March 2021 · Proposed COD December 2024

100 MW

Capacity

1

Components

Battery

5y 2m

In Queue

In Progress (unknown study)

IA Status

COD target: 2024

Interconnection

Total Duration

3y 9m

Schedule

17 months past proposed COD

In Study38%
Queue EntryMar 26, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-12-02

About

The proposed project PJM-AG2-344 is a 100 MW battery storage project located in Indiana, within the PJM Interconnection region. The project, which interconnects to the AEP utility system at the Dequine 345 bkV point of interconnection, entered the PJM queue on March 26, 2021.

The project's proposed commercial operation date is December 2, 2024. Its interconnection agreement status is currently listed as "In Progress (unknown study)".

Generated from interconnection queue and public data sources

Project Details

State

IN

County

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

AEP

Entity

PJM

Service Type

Point of Interconnection

Dequine 345 bkV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.