PJM-AG2-356
20 MW generation in Bradford, PA · In queue since March 2021 · Proposed COD January 2023
20 MW
Capacity
1
Components
Solar
5y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2023
Total Duration
1y 10m
Schedule
40 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-01-15
The proposed project PJM-AG2-356 is a 20 MW solar generation project located in Bradford County, Pennsylvania. It is interconnected to the PENELEC utility within the PJM Interconnection region. The project entered the PJM queue on March 26, 2021, with a proposed commercial operation date of January 15, 2023.
The interconnection agreement for the project is currently listed as "In Progress (unknown study)". The point of interconnection is the South Troy - Canton 34.5 kV line. The project has appeared in recent news.
Generated from interconnection queue and public data sources
State
PA
County
Bradford
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
PENELEC
Entity
PJM
Service Type
—
Point of Interconnection
South Troy - Canton 34.5 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- SOUTH