PJM-AG2-357
250 MW storage in Will, IL · In queue since March 2021 · Proposed COD November 2024
250 MW
Capacity
1
Components
Battery
5y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
3y 8m
Schedule
18 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-11-15
PJM-AG2-357 is a proposed 250 MW battery storage project located in Will County, Illinois. The project is interconnected within the PJM Interconnection queue, having entered the queue on March 26, 2021. Its proposed commercial operation date is November 15, 2024.
The interconnection agreement for the project is currently listed as "In Progress (unknown study)". The project is located within the ComEd utility territory and its point of interconnection is the Wilton 345 kV substation.
Generated from interconnection queue and public data sources
State
IL
County
Will
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ComEd
Entity
PJM
Service Type
—
Point of Interconnection
Wilton 345 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- 936 LINC12 KV LE-1
- POI Substation
- ComEd Wilton Center 765kV Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG2-357