Project PJM-AG2-365 — Project Summary

Queue ID
PJM-AG2-365
Capacity
35 MW
Technology
Solar
Status
active
Location
Mercer, PA
Region
PJM
Developer
IA Status
In Progress (unknown study)

PJM-AG2-365

PJM-AG2-365BetaActiveSolarPJMLBNL

35 MW generation in Mercer, PA · In queue since March 2021 · Proposed COD May 2023

35 MW

Capacity

1

Components

Solar

5y 2m

In Queue

In Progress (unknown study)

IA Status

COD target: 2023

Interconnection

Total Duration

2y 2m

Schedule

36 months past proposed COD

In Study38%
Queue EntryMar 26, 2021

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2023-05-31

About

PJM-AG2-365 is a proposed solar generation project located in Mercer County, Pennsylvania, within the PJM Interconnection region. The project, with a total capacity of 35 MW, consists entirely of solar photovoltaic technology. The queue entry date for PJM-AG2-365 is March 26, 2021, with a proposed commercial operation date of May 31, 2023. The interconnection agreement (IA) status is currently listed as "In Progress (unknown study)".

The proposed point of interconnection (POI) for the project is the Conneaut Lake-Werner 69 kV line, and the interconnecting utility is ATSI. The project is currently listed as active within the PJM interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

PA

County

Mercer

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

ATSI

Entity

PJM

Service Type

Point of Interconnection

Conneaut Lake-Werner 69 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
WESTERN HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.